1. Establish the project baseline
We clarify the product revision, quantity, schedule, quality expectations and the procurement decision. Where the requirement is incomplete, the first output is a clarification list—not an unsupported verdict.
2. Agree the investigation
The proposal identifies sites, processes, document requests, specialist input, reporting language and follow-up. Factory access and permission to review records are arranged before a visit.
3. Check the manufacturing chain
We follow the process from materials through assembly, testing and release. Capacity calculations consider effective working time, bottleneck cycle time, yield, existing commitments and outsourced operations where information is available.
4. Keep evidence categories separate
Observed
What the assessor directly saw, sampled or timed, with the relevant conditions.
Documented
What records show, including period, product match and known gaps.
Supplier-stated
Claims or forecasts that remain dependent on supplier confirmation.
Calculated
Analysis with explicit inputs, assumptions and sensitivity to changes.
5. Review and explain
Key conclusions and calculations are reviewed against their supporting evidence. We explain implications, prioritized actions and conditions for proceeding. Where evidence is insufficient, the report says what needs further checking.
6. Revisit the conditions
An agreed follow-up can check corrective actions, pilot results or changes in production conditions. A report describes the situation reviewed; a later change may require reassessment.
Clear responsibilities
We disclose relevant supplier relationships and agree fees and any referral arrangements before work. Sourcing recommendations retain a comparison and rationale; capability findings retain an evidence trail. We do not sell certificates or represent a consulting assessment as a guarantee of future performance.